File size: 9,699 Bytes
1f2d50a |
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 |
# KGraph-MCP Task List
## Project Overview
Building a Knowledge Graph-powered Multi-Agent Collaboration Platform for intelligent task orchestration and tool discovery.
## Milestones
### Milestone 0: Project Foundation (Sprint 0) β
Complete project setup with optimal development environment.
### Milestone 1: Core Infrastructure
Set up the foundational services and data models.
### Milestone 2: Knowledge Graph Integration
Implement KG storage, querying, and embedding services.
### Milestone 3: Agent Framework
Build the agent orchestration and tool discovery system.
### Milestone 4: UI & API
Create Gradio interface and FastAPI endpoints.
### Milestone 5: Testing & Documentation
Comprehensive testing and documentation.
## Detailed Task List
### Sprint 0: Foundation Tasks (Partially Complete)
#### Task 0.1: Repository Structure β
- **Status**: Done
- **Description**: Create directory structure and initialize packages
- **Acceptance Criteria**:
- All directories created
- Python packages have __init__.py files
#### Task 0.2: Configuration Files π
- **Status**: In Progress
- **Description**: Complete .gitignore, LICENSE, and other config files
- **Dependencies**: None
- **Acceptance Criteria**:
- .gitignore covers all necessary patterns
- LICENSE file is complete
- All config files in place
#### Task 0.3: Python Environment β
- **Status**: Done
- **Description**: Set up Python 3.11.8 with uv
- **Acceptance Criteria**:
- Python installed via uv
- Virtual environment created
- Dependencies installed
#### Task 0.4: Dependency Management β
- **Status**: Done
- **Description**: Create and lock dependencies
- **Acceptance Criteria**:
- requirements.txt and requirements-dev.txt created
- requirements.lock generated
- All dependencies installable
#### Task 0.5: Task Automation β
- **Status**: Done
- **Description**: Create justfile with common tasks
- **Acceptance Criteria**:
- justfile created with all necessary commands
- Commands work correctly
#### Task 0.6: Code Quality Tools π
- **Status**: Todo
- **Description**: Complete pyproject.toml configuration
- **Dependencies**: [0.4]
- **Acceptance Criteria**:
- Ruff configured
- Black configured
- Mypy configured
- Pytest configured
#### Task 0.7: Testing Setup β
- **Status**: Done
- **Description**: Set up pytest and create example tests
- **Acceptance Criteria**:
- Pytest runs successfully
- Example test passes
#### Task 0.8: Cursor Rules β
- **Status**: Done
- **Description**: Create .cursor/rules files
- **Acceptance Criteria**:
- Python/Gradio rules created
- Project management rules created
- Placeholder rules for ontology and KG
#### Task 0.9: CI Pipeline π
- **Status**: Todo
- **Description**: Complete GitHub Actions CI setup
- **Dependencies**: [0.6]
- **Acceptance Criteria**:
- CI runs on push/PR
- All checks pass
- Coverage reported
#### Task 0.10: CD Pipeline π
- **Status**: Todo
- **Description**: Set up Hugging Face deployment
- **Dependencies**: [0.9]
- **Acceptance Criteria**:
- Auto-deploy on main branch
- Secrets configured
- Deployment successful
### Milestone 1: Core Infrastructure Tasks
#### Task 1.1: FastAPI Application Structure π
- **Status**: Todo
- **Description**: Set up FastAPI app with proper structure
- **Dependencies**: [0.6]
- **Acceptance Criteria**:
- FastAPI app initialized
- Router structure defined
- Middleware configured
- CORS settings applied
#### Task 1.2: Database Models π
- **Status**: Todo
- **Description**: Create SQLAlchemy models for core entities
- **Dependencies**: [1.1]
- **Acceptance Criteria**:
- User model created
- Task model created
- Agent model created
- Tool model created
- All models have proper relationships
#### Task 1.3: Pydantic Schemas π
- **Status**: Todo
- **Description**: Create Pydantic v2 schemas for API
- **Dependencies**: [1.2]
- **Acceptance Criteria**:
- Request/response schemas defined
- Validation rules implemented
- ConfigDict properly used
#### Task 1.4: Database Migration System π
- **Status**: Todo
- **Description**: Set up Alembic for database migrations
- **Dependencies**: [1.2]
- **Acceptance Criteria**:
- Alembic configured
- Initial migration created
- Migration commands in justfile
#### Task 1.5: Configuration Management π
- **Status**: Todo
- **Description**: Implement settings with Pydantic
- **Dependencies**: [1.1]
- **Acceptance Criteria**:
- Settings class created
- Environment variables loaded
- Validation implemented
#### Task 1.6: Logging System π
- **Status**: Todo
- **Description**: Set up structured logging
- **Dependencies**: [1.5]
- **Acceptance Criteria**:
- JSON logging configured
- Log levels properly set
- Request ID tracking
### Milestone 2: Knowledge Graph Tasks
#### Task 2.1: KG Client Interface π
- **Status**: Todo
- **Description**: Create abstract interface for KG operations
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Interface defined
- CRUD operations specified
- Query methods defined
#### Task 2.2: Neo4j Integration π
- **Status**: Todo
- **Description**: Implement Neo4j client
- **Dependencies**: [2.1]
- **Acceptance Criteria**:
- Connection management
- Query execution
- Transaction support
#### Task 2.3: Embedding Service π
- **Status**: Todo
- **Description**: Implement embedding generation service
- **Dependencies**: [1.5]
- **Acceptance Criteria**:
- Sentence transformer integration
- Batch processing support
- Caching mechanism
#### Task 2.4: Vector Search π
- **Status**: Todo
- **Description**: Implement FAISS vector search
- **Dependencies**: [2.3]
- **Acceptance Criteria**:
- Index creation
- Similarity search
- Index persistence
#### Task 2.5: Ontology Schema π
- **Status**: Todo
- **Description**: Define JSON schemas for ontology
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Entity schemas defined
- Relationship schemas defined
- Validation working
### Milestone 3: Agent Framework Tasks
#### Task 3.1: Base Agent Class π
- **Status**: Todo
- **Description**: Create abstract base agent
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Interface defined
- State management
- Tool integration hooks
#### Task 3.2: Tool Registry π
- **Status**: Todo
- **Description**: Implement tool discovery and registration
- **Dependencies**: [3.1, 2.4]
- **Acceptance Criteria**:
- Tool registration API
- Tool discovery via KG
- Tool validation
#### Task 3.3: Task Orchestrator π
- **Status**: Todo
- **Description**: Build task routing and orchestration
- **Dependencies**: [3.1, 3.2]
- **Acceptance Criteria**:
- Task queue implementation
- Agent assignment logic
- Progress tracking
#### Task 3.4: Agent Communication π
- **Status**: Todo
- **Description**: Implement inter-agent messaging
- **Dependencies**: [3.1]
- **Acceptance Criteria**:
- Message protocol defined
- Async communication
- Error handling
### Milestone 4: UI & API Tasks
#### Task 4.1: Gradio Interface Layout π
- **Status**: Todo
- **Description**: Create main Gradio UI structure
- **Dependencies**: [3.3]
- **Acceptance Criteria**:
- Layout implemented
- Components defined
- State management
#### Task 4.2: API Endpoints π
- **Status**: Todo
- **Description**: Implement REST API endpoints
- **Dependencies**: [3.3]
- **Acceptance Criteria**:
- CRUD endpoints
- WebSocket support
- OpenAPI docs
#### Task 4.3: Real-time Updates π
- **Status**: Todo
- **Description**: Implement WebSocket for live updates
- **Dependencies**: [4.2]
- **Acceptance Criteria**:
- WebSocket server
- Client integration
- Event streaming
#### Task 4.4: Authentication π
- **Status**: Todo
- **Description**: Implement JWT authentication
- **Dependencies**: [1.2, 4.2]
- **Acceptance Criteria**:
- Login endpoint
- Token validation
- Protected routes
### Milestone 5: Testing & Documentation Tasks
#### Task 5.1: Unit Tests π
- **Status**: Todo
- **Description**: Write comprehensive unit tests
- **Dependencies**: [All implementation tasks]
- **Acceptance Criteria**:
- 80% coverage minimum
- All edge cases covered
- Mocks properly used
#### Task 5.2: Integration Tests π
- **Status**: Todo
- **Description**: Write API integration tests
- **Dependencies**: [5.1]
- **Acceptance Criteria**:
- Full API coverage
- Database rollback
- External service mocks
#### Task 5.3: Performance Tests π
- **Status**: Todo
- **Description**: Implement load and performance tests
- **Dependencies**: [5.2]
- **Acceptance Criteria**:
- Load test scenarios
- Performance benchmarks
- Bottleneck identification
#### Task 5.4: Documentation π
- **Status**: Todo
- **Description**: Complete project documentation
- **Dependencies**: [5.1]
- **Acceptance Criteria**:
- API documentation
- Architecture docs
- Deployment guide
- User guide
## Task Prioritization
### Critical Path (Must Have for MVP):
1. Complete Sprint 0 setup (Tasks 0.6, 0.9)
2. Core Infrastructure (Tasks 1.1-1.5)
3. Basic KG Integration (Tasks 2.1, 2.3)
4. Simple Agent Framework (Tasks 3.1, 3.2)
5. Basic UI (Task 4.1)
6. Essential Tests (Task 5.1 partial)
### Nice to Have:
- Advanced KG features (Tasks 2.2, 2.4, 2.5)
- Full agent orchestration (Tasks 3.3, 3.4)
- Complete API (Tasks 4.2-4.4)
- Comprehensive testing (Tasks 5.2-5.4)
## Notes
- Tasks marked with π are Todo
- Tasks marked with π are In Progress
- Tasks marked with β
are Done
- Dependencies must be completed before starting dependent tasks
- Each task should result in a PR with tests |