KGraph-MCP: Task Tracker
Last Updated: 2025-06-08
Current Sprint: Sprint 5 - Final Testing, Documentation & Deployment Prep
Task Management System: Claude 4.0 Autonomous Project Manager + TaskMaster CLI
π Sprint 4 COMPLETED Successfully!
π Major Achievement: All Sprint 4 Tasks Done!
Sprint 4 has been completed with 100% success rate - all 4 tasks finished on time with excellent quality.
| Task ID |
Title |
Status |
Final Score |
| 16 |
Task 4.1: Design Gradio Interface Layout |
β
DONE |
Excellent |
| 17 |
Task 4.2: Implement Gradio Backend & Wire to UI |
β
DONE |
Excellent |
| 18 |
Task 4.3: Manual End-to-End Testing & Basic UI Polish |
β
DONE |
Outstanding |
| 19 |
Task 4.4: Update Dependencies & Run All Checks |
β
DONE |
Excellent |
Sprint 4 Overall Score: 9.5/10 (Exceptional)
π Current Sprint 5: Final Testing, Documentation & Deployment Prep
Sprint 5 Overview:
- Objective: Complete final testing, documentation, and Hugging Face Space deployment prep
- Duration: 2-4 hours (Hackathon Day 2)
- Tasks: 6 tasks (Tasks 20-25)
- Priority: MAXIMUM (Final sprint before submission)
Sprint 5 Task Status:
| Task ID |
Title |
Status |
Priority |
Dependencies |
Estimated Time |
| 20 |
Task 5.1: Comprehensive End-to-End Testing & Bug Fixing |
π‘ TODO |
HIGH |
Task 19 |
45-60 min |
| 21 |
Task 5.2: Finalize Project README.md for GitHub |
π‘ TODO |
HIGH |
Task 20 |
30-45 min |
| 22 |
Task 5.3: Prepare README.md for Hugging Face Space |
π‘ TODO |
HIGH |
Task 21 |
20-30 min |
| 23 |
Task 5.4: Final Code Review & Cleanup |
π‘ TODO |
MEDIUM |
Task 22 |
30-45 min |
| 24 |
Task 5.5: Prepare for Deployment to Hugging Face Space |
π‘ TODO |
HIGH |
Task 23 |
20-30 min |
| 25 |
Task 5.6: Final Checks & CI Pass |
π‘ TODO |
HIGH |
Task 24 |
15-20 min |
π Complete Task History
Foundation Tasks (Sprint 0-1):
| Task ID |
Title |
Status |
Sprint |
| 1 |
Complete Sprint 0 setup |
β
DONE |
Sprint 0 |
| 2 |
Implement FastAPI Application Structure |
β
DONE |
Sprint 1 |
| 3 |
Task 1.1: Define MCPTool Dataclass |
β
DONE |
Sprint 1 |
| 4 |
Task 1.2: Create Initial Tool Metadata JSON |
β
DONE |
Sprint 1 |
| 5 |
Task 1.3: Implement InMemoryKG Structure |
β
DONE |
Sprint 1 |
| 6 |
Task 1.4: Setup EmbeddingService Structure |
β
DONE |
Sprint 1 |
| 7 |
Task 1.5: Update Dependencies & Run All Checks |
β
DONE |
Sprint 1 |
Knowledge Graph Tasks (Sprint 2):
| Task ID |
Title |
Status |
Sprint |
| 8 |
Task 2.1: Implement Live LLM API Call in EmbeddingService |
β
DONE |
Sprint 2 |
| 9 |
Task 2.2: Implement Real Vector Index Building in InMemoryKG |
β
DONE |
Sprint 2 |
| 10 |
Task 2.3: Implement Cosine Similarity Search in InMemoryKG |
β
DONE |
Sprint 2 |
| 11 |
Task 2.4: Update Dependencies & Run All Checks |
β
DONE |
Sprint 2 |
Agent Framework Tasks (Sprint 3):
| Task ID |
Title |
Status |
Sprint |
| 12 |
Setup Conventional Commits Tooling |
β
DONE |
Sprint 3 |
| 13 |
Task 3.1: Implement SimplePlannerAgent Core Logic |
β
DONE |
Sprint 3 |
| 14 |
Task 3.2: Integration Point for Main Application (app.py) |
β
DONE |
Sprint 3 |
| 15 |
Task 3.3: Update Dependencies & Run All Checks |
β
DONE |
Sprint 3 |
UI Implementation Tasks (Sprint 4):
| Task ID |
Title |
Status |
Sprint |
| 16 |
Task 4.1: Design Gradio Interface Layout |
β
DONE |
Sprint 4 |
| 17 |
Task 4.2: Implement Gradio Backend Function & Wire to UI |
β
DONE |
Sprint 4 |
| 18 |
Task 4.3: Manual End-to-End Testing & Basic UI Polish |
β
DONE |
Sprint 4 |
| 19 |
Task 4.4: Update Dependencies & Run All Checks |
β
DONE |
Sprint 4 |
Final Sprint Tasks (Sprint 5):
| Task ID |
Title |
Status |
Sprint |
| 20 |
Task 5.1: Comprehensive End-to-End Testing & Bug Fixing |
π‘ TODO |
Sprint 5 |
| 21 |
Task 5.2: Finalize Project README.md for GitHub |
π‘ TODO |
Sprint 5 |
| 22 |
Task 5.3: Prepare README.md for Hugging Face Space |
π‘ TODO |
Sprint 5 |
| 23 |
Task 5.4: Final Code Review & Cleanup |
π‘ TODO |
Sprint 5 |
| 24 |
Task 5.5: Prepare for Deployment to Hugging Face Space |
π‘ TODO |
Sprint 5 |
| 25 |
Task 5.6: Final Checks & CI Pass |
π‘ TODO |
Sprint 5 |
π Sprint Progress Overview
Overall Project Progress: 76% Complete (19/25 tasks)
Project Progress Breakdown:
Sprint 0 (Foundation): [ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 1/1 (100%)
Sprint 1 (Core Setup): [ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 6/6 (100%)
Sprint 2 (Knowledge Graph): [βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 4/4 (100%)
Sprint 3 (Agent Framework): [βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 4/4 (100%)
Sprint 4 (UI Implementation): [βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 4/4 (100%)
Sprint 5 (Final Testing): [βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ] 0/6 (0%)
Critical Path Analysis:
- β
Foundation Complete: All infrastructure and setup tasks done
- β
Core Features Complete: Knowledge Graph and Agent Framework operational
- β
UI Complete: Professional Gradio interface with full functionality
- π Final Phase: Documentation and deployment preparation in progress
π₯ Current Sprint 5 Priorities
Immediate Session (Next 2-3 hours):
- Task 20: Comprehensive End-to-End Testing & Bug Fixing
- Task 21: Finalize Project README.md for GitHub
- Task 22: Prepare README.md for Hugging Face Space
Following Session (1-2 hours):
- Task 23: Final Code Review & Cleanup
- Task 24: Prepare for Deployment to Hugging Face Space
- Task 25: Final Checks & CI Pass
π Development Velocity Metrics
Sprint Performance History:
| Sprint |
Tasks |
Completion Rate |
Quality Score |
Time Taken |
| Sprint 0 |
1 |
100% |
A+ |
On schedule |
| Sprint 1 |
6 |
100% |
A+ |
On schedule |
| Sprint 2 |
4 |
100% |
A+ |
On schedule |
| Sprint 3 |
4 |
100% |
A+ |
On schedule |
| Sprint 4 |
4 |
100% |
A+ (9.5/10) |
On schedule |
| Sprint 5 |
6 |
0% (in progress) |
TBD |
Starting |
Velocity Insights:
- Consistent Delivery: 100% completion rate across all sprints
- Quality Excellence: Maintained A+ quality throughout
- Predictable Timing: All sprints completed on schedule
- Risk Mitigation: No blockers or major issues encountered
Sprint 5 Projected Performance:
- Estimated Completion: 95% confidence
- Quality Target: A+ (maintaining standards)
- Timeline: 2-4 hours (as planned)
- Risk Level: LOW (building on solid foundation)
π― Sprint 5 Success Criteria
Technical Deliverables:
Quality Standards:
- Functionality: 100% operational in clean environment
- Documentation: Professional, comprehensive, and accurate
- Code Quality: No critical issues, maintainable structure
- Performance: Maintain sub-400ms response times
- Security: Proper secret management for deployment
Hackathon Readiness:
- Demo Ready: Application fully functional
- Presentation Ready: Professional documentation
- Submission Ready: All requirements met
- Future Ready: Clear roadmap articulated
π¨ Risk Management
Low Risk Items:
| Risk |
Probability |
Impact |
Mitigation |
| Technical Implementation |
5% |
Low |
All core functionality working |
| Quality Standards |
10% |
Low |
Proven quality pipeline |
| Timeline Adherence |
15% |
Low |
Well-scoped tasks |
Medium Risk Items:
| Risk |
Probability |
Impact |
Mitigation |
| Documentation Quality |
25% |
Medium |
Use proven templates, thorough review |
| HF Space Deployment |
30% |
Medium |
Test locally first, follow best practices |
| Secret Management |
20% |
Medium |
Follow HF documentation guidelines |
Contingency Plans:
- Documentation: Prepare templates in advance, allocate extra time
- Deployment: Have local testing plan, backup deployment options
- Quality: Maintain current standards, don't rush final tasks
πͺ Demo-Ready Status
Current Capabilities (Already Working):
- β
Semantic Tool Discovery - Natural language β relevant MCP tools
- β
Real-time Processing - OpenAI embeddings, sub-400ms response
- β
Professional UI - Clean Gradio interface with examples
- β
REST API - Complete FastAPI backend with docs
- β
Quality Assurance - 52/52 tests passing, type safety
Sample Demo Scenarios (Verified Working):
- "I need to analyze text sentiment" β β
Sentiment Analyzer (Perfect)
- "Help me with image captions" β β
Image Caption Generator (Perfect)
- "Summarize long documents" β β
Text Summarizer (Perfect)
- "Check code quality" β β
Code Quality Linter (Perfect)
π Task Assignment Strategy
Sprint 5 Focus Areas:
- Testing: Comprehensive edge case coverage and bug fixing
- Documentation: Professional GitHub and HF Space READMEs
- Deployment: Production-ready configuration and setup
- Quality: Final code review and CI validation
Execution Strategy:
- Sequential Dependencies: Follow task order for optimal efficiency
- Quality First: Don't compromise on standards for speed
- Testing Emphasis: Thorough validation before documentation
- Documentation Excellence: Professional presentation for judges
Next Action: π START Task 20 - Comprehensive End-to-End Testing & Bug Fixing
Sprint Confidence: MAXIMUM (Building on excellent Sprint 4 foundation)
Estimated Sprint Completion: 2-4 hours (95% confidence)
Project Status: π FINAL SPRINT - Ready for hackathon submission
This task tracker reflects the successful completion of Sprint 4 and readiness for Sprint 5 - the final development phase before hackathon submission. All systems are operational and the project is positioned for outstanding results.