# KGraph-MCP: Task Tracker
**Last Updated:** 2025-06-08
**Current Sprint:** Sprint 5 - Final Testing, Documentation & Deployment Prep
**Task Management System:** Claude 4.0 Autonomous Project Manager + TaskMaster CLI
---
## πŸŽ‰ Sprint 4 COMPLETED Successfully!
### **πŸ† Major Achievement: All Sprint 4 Tasks Done!**
Sprint 4 has been completed with **100% success rate** - all 4 tasks finished on time with excellent quality.
| Task ID | Title | Status | Final Score |
|---------|-------|--------|-------------|
| **16** | Task 4.1: Design Gradio Interface Layout | βœ… DONE | Excellent |
| **17** | Task 4.2: Implement Gradio Backend & Wire to UI | βœ… DONE | Excellent |
| **18** | Task 4.3: Manual End-to-End Testing & Basic UI Polish | βœ… DONE | Outstanding |
| **19** | Task 4.4: Update Dependencies & Run All Checks | βœ… DONE | Excellent |
**Sprint 4 Overall Score:** 9.5/10 (Exceptional)
---
## πŸš€ Current Sprint 5: Final Testing, Documentation & Deployment Prep
### **Sprint 5 Overview:**
- **Objective:** Complete final testing, documentation, and Hugging Face Space deployment prep
- **Duration:** 2-4 hours (Hackathon Day 2)
- **Tasks:** 6 tasks (Tasks 20-25)
- **Priority:** MAXIMUM (Final sprint before submission)
### **Sprint 5 Task Status:**
| Task ID | Title | Status | Priority | Dependencies | Estimated Time |
|---------|-------|--------|----------|--------------|----------------|
| **20** | Task 5.1: Comprehensive End-to-End Testing & Bug Fixing | 🟑 TODO | HIGH | Task 19 | 45-60 min |
| **21** | Task 5.2: Finalize Project README.md for GitHub | 🟑 TODO | HIGH | Task 20 | 30-45 min |
| **22** | Task 5.3: Prepare README.md for Hugging Face Space | 🟑 TODO | HIGH | Task 21 | 20-30 min |
| **23** | Task 5.4: Final Code Review & Cleanup | 🟑 TODO | MEDIUM | Task 22 | 30-45 min |
| **24** | Task 5.5: Prepare for Deployment to Hugging Face Space | 🟑 TODO | HIGH | Task 23 | 20-30 min |
| **25** | Task 5.6: Final Checks & CI Pass | 🟑 TODO | HIGH | Task 24 | 15-20 min |
---
## πŸ“‹ Complete Task History
### **Foundation Tasks (Sprint 0-1):**
| Task ID | Title | Status | Sprint |
|---------|-------|--------|--------|
| **1** | Complete Sprint 0 setup | βœ… DONE | Sprint 0 |
| **2** | Implement FastAPI Application Structure | βœ… DONE | Sprint 1 |
| **3** | Task 1.1: Define MCPTool Dataclass | βœ… DONE | Sprint 1 |
| **4** | Task 1.2: Create Initial Tool Metadata JSON | βœ… DONE | Sprint 1 |
| **5** | Task 1.3: Implement InMemoryKG Structure | βœ… DONE | Sprint 1 |
| **6** | Task 1.4: Setup EmbeddingService Structure | βœ… DONE | Sprint 1 |
| **7** | Task 1.5: Update Dependencies & Run All Checks | βœ… DONE | Sprint 1 |
### **Knowledge Graph Tasks (Sprint 2):**
| Task ID | Title | Status | Sprint |
|---------|-------|--------|--------|
| **8** | Task 2.1: Implement Live LLM API Call in EmbeddingService | βœ… DONE | Sprint 2 |
| **9** | Task 2.2: Implement Real Vector Index Building in InMemoryKG | βœ… DONE | Sprint 2 |
| **10** | Task 2.3: Implement Cosine Similarity Search in InMemoryKG | βœ… DONE | Sprint 2 |
| **11** | Task 2.4: Update Dependencies & Run All Checks | βœ… DONE | Sprint 2 |
### **Agent Framework Tasks (Sprint 3):**
| Task ID | Title | Status | Sprint |
|---------|-------|--------|--------|
| **12** | Setup Conventional Commits Tooling | βœ… DONE | Sprint 3 |
| **13** | Task 3.1: Implement SimplePlannerAgent Core Logic | βœ… DONE | Sprint 3 |
| **14** | Task 3.2: Integration Point for Main Application (app.py) | βœ… DONE | Sprint 3 |
| **15** | Task 3.3: Update Dependencies & Run All Checks | βœ… DONE | Sprint 3 |
### **UI Implementation Tasks (Sprint 4):**
| Task ID | Title | Status | Sprint |
|---------|-------|--------|--------|
| **16** | Task 4.1: Design Gradio Interface Layout | βœ… DONE | Sprint 4 |
| **17** | Task 4.2: Implement Gradio Backend Function & Wire to UI | βœ… DONE | Sprint 4 |
| **18** | Task 4.3: Manual End-to-End Testing & Basic UI Polish | βœ… DONE | Sprint 4 |
| **19** | Task 4.4: Update Dependencies & Run All Checks | βœ… DONE | Sprint 4 |
### **Final Sprint Tasks (Sprint 5):**
| Task ID | Title | Status | Sprint |
|---------|-------|--------|--------|
| **20** | Task 5.1: Comprehensive End-to-End Testing & Bug Fixing | 🟑 TODO | Sprint 5 |
| **21** | Task 5.2: Finalize Project README.md for GitHub | 🟑 TODO | Sprint 5 |
| **22** | Task 5.3: Prepare README.md for Hugging Face Space | 🟑 TODO | Sprint 5 |
| **23** | Task 5.4: Final Code Review & Cleanup | 🟑 TODO | Sprint 5 |
| **24** | Task 5.5: Prepare for Deployment to Hugging Face Space | 🟑 TODO | Sprint 5 |
| **25** | Task 5.6: Final Checks & CI Pass | 🟑 TODO | Sprint 5 |
---
## πŸ“Š Sprint Progress Overview
### **Overall Project Progress: 76% Complete (19/25 tasks)**
```
Project Progress Breakdown:
Sprint 0 (Foundation): [β–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆ] 1/1 (100%)
Sprint 1 (Core Setup): [β–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆ] 6/6 (100%)
Sprint 2 (Knowledge Graph): [β–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆ] 4/4 (100%)
Sprint 3 (Agent Framework): [β–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆ] 4/4 (100%)
Sprint 4 (UI Implementation): [β–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆβ–ˆ] 4/4 (100%)
Sprint 5 (Final Testing): [β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘β–‘] 0/6 (0%)
```
### **Critical Path Analysis:**
- **βœ… Foundation Complete:** All infrastructure and setup tasks done
- **βœ… Core Features Complete:** Knowledge Graph and Agent Framework operational
- **βœ… UI Complete:** Professional Gradio interface with full functionality
- **πŸ”„ Final Phase:** Documentation and deployment preparation in progress
---
## πŸ”₯ Current Sprint 5 Priorities
### **Immediate Session (Next 2-3 hours):**
1. **Task 20:** Comprehensive End-to-End Testing & Bug Fixing
2. **Task 21:** Finalize Project README.md for GitHub
3. **Task 22:** Prepare README.md for Hugging Face Space
### **Following Session (1-2 hours):**
4. **Task 23:** Final Code Review & Cleanup
5. **Task 24:** Prepare for Deployment to Hugging Face Space
6. **Task 25:** Final Checks & CI Pass
---
## πŸ“ˆ Development Velocity Metrics
### **Sprint Performance History:**
| Sprint | Tasks | Completion Rate | Quality Score | Time Taken |
|--------|-------|----------------|---------------|------------|
| **Sprint 0** | 1 | 100% | A+ | On schedule |
| **Sprint 1** | 6 | 100% | A+ | On schedule |
| **Sprint 2** | 4 | 100% | A+ | On schedule |
| **Sprint 3** | 4 | 100% | A+ | On schedule |
| **Sprint 4** | 4 | 100% | A+ (9.5/10) | On schedule |
| **Sprint 5** | 6 | 0% (in progress) | TBD | Starting |
### **Velocity Insights:**
- **Consistent Delivery:** 100% completion rate across all sprints
- **Quality Excellence:** Maintained A+ quality throughout
- **Predictable Timing:** All sprints completed on schedule
- **Risk Mitigation:** No blockers or major issues encountered
### **Sprint 5 Projected Performance:**
- **Estimated Completion:** 95% confidence
- **Quality Target:** A+ (maintaining standards)
- **Timeline:** 2-4 hours (as planned)
- **Risk Level:** LOW (building on solid foundation)
---
## 🎯 Sprint 5 Success Criteria
### **Technical Deliverables:**
- [ ] **Comprehensive Testing:** All edge cases covered, bugs fixed
- [ ] **Professional Documentation:** GitHub README complete
- [ ] **HF Space Ready:** Deployment-ready README with metadata
- [ ] **Clean Codebase:** Production-quality code review
- [ ] **Deployment Config:** Requirements and secrets management
- [ ] **Quality Gates:** All CI checks passing
### **Quality Standards:**
- **Functionality:** 100% operational in clean environment
- **Documentation:** Professional, comprehensive, and accurate
- **Code Quality:** No critical issues, maintainable structure
- **Performance:** Maintain sub-400ms response times
- **Security:** Proper secret management for deployment
### **Hackathon Readiness:**
- **Demo Ready:** Application fully functional
- **Presentation Ready:** Professional documentation
- **Submission Ready:** All requirements met
- **Future Ready:** Clear roadmap articulated
---
## 🚨 Risk Management
### **Low Risk Items:**
| Risk | Probability | Impact | Mitigation |
|------|-------------|--------|------------|
| Technical Implementation | 5% | Low | All core functionality working |
| Quality Standards | 10% | Low | Proven quality pipeline |
| Timeline Adherence | 15% | Low | Well-scoped tasks |
### **Medium Risk Items:**
| Risk | Probability | Impact | Mitigation |
|------|-------------|--------|------------|
| Documentation Quality | 25% | Medium | Use proven templates, thorough review |
| HF Space Deployment | 30% | Medium | Test locally first, follow best practices |
| Secret Management | 20% | Medium | Follow HF documentation guidelines |
### **Contingency Plans:**
- **Documentation:** Prepare templates in advance, allocate extra time
- **Deployment:** Have local testing plan, backup deployment options
- **Quality:** Maintain current standards, don't rush final tasks
---
## πŸŽͺ Demo-Ready Status
### **Current Capabilities (Already Working):**
- βœ… **Semantic Tool Discovery** - Natural language β†’ relevant MCP tools
- βœ… **Real-time Processing** - OpenAI embeddings, sub-400ms response
- βœ… **Professional UI** - Clean Gradio interface with examples
- βœ… **REST API** - Complete FastAPI backend with docs
- βœ… **Quality Assurance** - 52/52 tests passing, type safety
### **Sample Demo Scenarios (Verified Working):**
1. **"I need to analyze text sentiment"** β†’ βœ… Sentiment Analyzer (Perfect)
2. **"Help me with image captions"** β†’ βœ… Image Caption Generator (Perfect)
3. **"Summarize long documents"** β†’ βœ… Text Summarizer (Perfect)
4. **"Check code quality"** β†’ βœ… Code Quality Linter (Perfect)
---
## πŸ”„ Task Assignment Strategy
### **Sprint 5 Focus Areas:**
- **Testing:** Comprehensive edge case coverage and bug fixing
- **Documentation:** Professional GitHub and HF Space READMEs
- **Deployment:** Production-ready configuration and setup
- **Quality:** Final code review and CI validation
### **Execution Strategy:**
- **Sequential Dependencies:** Follow task order for optimal efficiency
- **Quality First:** Don't compromise on standards for speed
- **Testing Emphasis:** Thorough validation before documentation
- **Documentation Excellence:** Professional presentation for judges
---
**Next Action:** πŸš€ **START Task 20 - Comprehensive End-to-End Testing & Bug Fixing**
**Sprint Confidence:** MAXIMUM (Building on excellent Sprint 4 foundation)
**Estimated Sprint Completion:** 2-4 hours (95% confidence)
**Project Status:** 🏁 **FINAL SPRINT** - Ready for hackathon submission
---
*This task tracker reflects the successful completion of Sprint 4 and readiness for Sprint 5 - the final development phase before hackathon submission. All systems are operational and the project is positioned for outstanding results.*