BasalGanglia's picture
πŸ† Multi-Track Hackathon Submission
1f2d50a verified
# KGraph-MCP Task List
## Project Overview
Building a Knowledge Graph-powered Multi-Agent Collaboration Platform for intelligent task orchestration and tool discovery.
## Milestones
### Milestone 0: Project Foundation (Sprint 0) βœ…
Complete project setup with optimal development environment.
### Milestone 1: Core Infrastructure
Set up the foundational services and data models.
### Milestone 2: Knowledge Graph Integration
Implement KG storage, querying, and embedding services.
### Milestone 3: Agent Framework
Build the agent orchestration and tool discovery system.
### Milestone 4: UI & API
Create Gradio interface and FastAPI endpoints.
### Milestone 5: Testing & Documentation
Comprehensive testing and documentation.
## Detailed Task List
### Sprint 0: Foundation Tasks (Partially Complete)
#### Task 0.1: Repository Structure βœ…
- **Status**: Done
- **Description**: Create directory structure and initialize packages
- **Acceptance Criteria**:
- All directories created
- Python packages have __init__.py files
#### Task 0.2: Configuration Files πŸ”„
- **Status**: In Progress
- **Description**: Complete .gitignore, LICENSE, and other config files
- **Dependencies**: None
- **Acceptance Criteria**:
- .gitignore covers all necessary patterns
- LICENSE file is complete
- All config files in place
#### Task 0.3: Python Environment βœ…
- **Status**: Done
- **Description**: Set up Python 3.11.8 with uv
- **Acceptance Criteria**:
- Python installed via uv
- Virtual environment created
- Dependencies installed
#### Task 0.4: Dependency Management βœ…
- **Status**: Done
- **Description**: Create and lock dependencies
- **Acceptance Criteria**:
- requirements.txt and requirements-dev.txt created
- requirements.lock generated
- All dependencies installable
#### Task 0.5: Task Automation βœ…
- **Status**: Done
- **Description**: Create justfile with common tasks
- **Acceptance Criteria**:
- justfile created with all necessary commands
- Commands work correctly
#### Task 0.6: Code Quality Tools πŸ“‹
- **Status**: Todo
- **Description**: Complete pyproject.toml configuration
- **Dependencies**: [0.4]
- **Acceptance Criteria**:
- Ruff configured
- Black configured
- Mypy configured
- Pytest configured
#### Task 0.7: Testing Setup βœ…
- **Status**: Done
- **Description**: Set up pytest and create example tests
- **Acceptance Criteria**:
- Pytest runs successfully
- Example test passes
#### Task 0.8: Cursor Rules βœ…
- **Status**: Done
- **Description**: Create .cursor/rules files
- **Acceptance Criteria**:
- Python/Gradio rules created
- Project management rules created
- Placeholder rules for ontology and KG
#### Task 0.9: CI Pipeline πŸ“‹
- **Status**: Todo
- **Description**: Complete GitHub Actions CI setup
- **Dependencies**: [0.6]
- **Acceptance Criteria**:
- CI runs on push/PR
- All checks pass
- Coverage reported
#### Task 0.10: CD Pipeline πŸ“‹
- **Status**: Todo
- **Description**: Set up Hugging Face deployment
- **Dependencies**: [0.9]
- **Acceptance Criteria**:
- Auto-deploy on main branch
- Secrets configured
- Deployment successful
### Milestone 1: Core Infrastructure Tasks
#### Task 1.1: FastAPI Application Structure πŸ“‹
- **Status**: Todo
- **Description**: Set up FastAPI app with proper structure
- **Dependencies**: [0.6]
- **Acceptance Criteria**:
- FastAPI app initialized
- Router structure defined
- Middleware configured
- CORS settings applied
#### Task 1.2: Database Models πŸ“‹
- **Status**: Todo
- **Description**: Create SQLAlchemy models for core entities
- **Dependencies**: [1.1]
- **Acceptance Criteria**:
- User model created
- Task model created
- Agent model created
- Tool model created
- All models have proper relationships
#### Task 1.3: Pydantic Schemas πŸ“‹
- **Status**: Todo
- **Description**: Create Pydantic v2 schemas for API
- **Dependencies**: [1.2]
- **Acceptance Criteria**:
- Request/response schemas defined
- Validation rules implemented
- ConfigDict properly used
#### Task 1.4: Database Migration System πŸ“‹
- **Status**: Todo
- **Description**: Set up Alembic for database migrations
- **Dependencies**: [1.2]
- **Acceptance Criteria**:
- Alembic configured
- Initial migration created
- Migration commands in justfile
#### Task 1.5: Configuration Management πŸ“‹
- **Status**: Todo
- **Description**: Implement settings with Pydantic
- **Dependencies**: [1.1]
- **Acceptance Criteria**:
- Settings class created
- Environment variables loaded
- Validation implemented
#### Task 1.6: Logging System πŸ“‹
- **Status**: Todo
- **Description**: Set up structured logging
- **Dependencies**: [1.5]
- **Acceptance Criteria**:
- JSON logging configured
- Log levels properly set
- Request ID tracking
### Milestone 2: Knowledge Graph Tasks
#### Task 2.1: KG Client Interface πŸ“‹
- **Status**: Todo
- **Description**: Create abstract interface for KG operations
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Interface defined
- CRUD operations specified
- Query methods defined
#### Task 2.2: Neo4j Integration πŸ“‹
- **Status**: Todo
- **Description**: Implement Neo4j client
- **Dependencies**: [2.1]
- **Acceptance Criteria**:
- Connection management
- Query execution
- Transaction support
#### Task 2.3: Embedding Service πŸ“‹
- **Status**: Todo
- **Description**: Implement embedding generation service
- **Dependencies**: [1.5]
- **Acceptance Criteria**:
- Sentence transformer integration
- Batch processing support
- Caching mechanism
#### Task 2.4: Vector Search πŸ“‹
- **Status**: Todo
- **Description**: Implement FAISS vector search
- **Dependencies**: [2.3]
- **Acceptance Criteria**:
- Index creation
- Similarity search
- Index persistence
#### Task 2.5: Ontology Schema πŸ“‹
- **Status**: Todo
- **Description**: Define JSON schemas for ontology
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Entity schemas defined
- Relationship schemas defined
- Validation working
### Milestone 3: Agent Framework Tasks
#### Task 3.1: Base Agent Class πŸ“‹
- **Status**: Todo
- **Description**: Create abstract base agent
- **Dependencies**: [1.3]
- **Acceptance Criteria**:
- Interface defined
- State management
- Tool integration hooks
#### Task 3.2: Tool Registry πŸ“‹
- **Status**: Todo
- **Description**: Implement tool discovery and registration
- **Dependencies**: [3.1, 2.4]
- **Acceptance Criteria**:
- Tool registration API
- Tool discovery via KG
- Tool validation
#### Task 3.3: Task Orchestrator πŸ“‹
- **Status**: Todo
- **Description**: Build task routing and orchestration
- **Dependencies**: [3.1, 3.2]
- **Acceptance Criteria**:
- Task queue implementation
- Agent assignment logic
- Progress tracking
#### Task 3.4: Agent Communication πŸ“‹
- **Status**: Todo
- **Description**: Implement inter-agent messaging
- **Dependencies**: [3.1]
- **Acceptance Criteria**:
- Message protocol defined
- Async communication
- Error handling
### Milestone 4: UI & API Tasks
#### Task 4.1: Gradio Interface Layout πŸ“‹
- **Status**: Todo
- **Description**: Create main Gradio UI structure
- **Dependencies**: [3.3]
- **Acceptance Criteria**:
- Layout implemented
- Components defined
- State management
#### Task 4.2: API Endpoints πŸ“‹
- **Status**: Todo
- **Description**: Implement REST API endpoints
- **Dependencies**: [3.3]
- **Acceptance Criteria**:
- CRUD endpoints
- WebSocket support
- OpenAPI docs
#### Task 4.3: Real-time Updates πŸ“‹
- **Status**: Todo
- **Description**: Implement WebSocket for live updates
- **Dependencies**: [4.2]
- **Acceptance Criteria**:
- WebSocket server
- Client integration
- Event streaming
#### Task 4.4: Authentication πŸ“‹
- **Status**: Todo
- **Description**: Implement JWT authentication
- **Dependencies**: [1.2, 4.2]
- **Acceptance Criteria**:
- Login endpoint
- Token validation
- Protected routes
### Milestone 5: Testing & Documentation Tasks
#### Task 5.1: Unit Tests πŸ“‹
- **Status**: Todo
- **Description**: Write comprehensive unit tests
- **Dependencies**: [All implementation tasks]
- **Acceptance Criteria**:
- 80% coverage minimum
- All edge cases covered
- Mocks properly used
#### Task 5.2: Integration Tests πŸ“‹
- **Status**: Todo
- **Description**: Write API integration tests
- **Dependencies**: [5.1]
- **Acceptance Criteria**:
- Full API coverage
- Database rollback
- External service mocks
#### Task 5.3: Performance Tests πŸ“‹
- **Status**: Todo
- **Description**: Implement load and performance tests
- **Dependencies**: [5.2]
- **Acceptance Criteria**:
- Load test scenarios
- Performance benchmarks
- Bottleneck identification
#### Task 5.4: Documentation πŸ“‹
- **Status**: Todo
- **Description**: Complete project documentation
- **Dependencies**: [5.1]
- **Acceptance Criteria**:
- API documentation
- Architecture docs
- Deployment guide
- User guide
## Task Prioritization
### Critical Path (Must Have for MVP):
1. Complete Sprint 0 setup (Tasks 0.6, 0.9)
2. Core Infrastructure (Tasks 1.1-1.5)
3. Basic KG Integration (Tasks 2.1, 2.3)
4. Simple Agent Framework (Tasks 3.1, 3.2)
5. Basic UI (Task 4.1)
6. Essential Tests (Task 5.1 partial)
### Nice to Have:
- Advanced KG features (Tasks 2.2, 2.4, 2.5)
- Full agent orchestration (Tasks 3.3, 3.4)
- Complete API (Tasks 4.2-4.4)
- Comprehensive testing (Tasks 5.2-5.4)
## Notes
- Tasks marked with πŸ“‹ are Todo
- Tasks marked with πŸ”„ are In Progress
- Tasks marked with βœ… are Done
- Dependencies must be completed before starting dependent tasks
- Each task should result in a PR with tests